Although not as busy as it could have been. Unfortunately, late last night we found out that due to a run over with another job, the framers can't make it until next week. I was miffed. But today there are smiles. You see the large cherry picker and frames, with possibly a crane, would not… Continue reading Busy today
Category: The Build 2021
How it is all going…
It has been busy and not busy. The dormers are complete and the second fix for the studio is going in today but the fella and I have been a little out of sorts. Headaches and pains and not feeling right. I thought it was the cold but then I started to wander if it… Continue reading How it is all going…
Why so quiet?
Not sure. I had every intention of writing a post last week. Every intention of writing one Monday and Tuesday but I have been tired from being super busy. You see the build has come on leaps and bounds. If anything we are now on a quiet time as we are waiting for the wooden… Continue reading Why so quiet?
Through the round window
It arrived! The round window is here and it is lovely... I think once it is in, it is going to make the space. I can't wait for the hand over of the studio. That looks like next week as we are waiting for the picture window. But it is looking so good already. That… Continue reading Through the round window
The Studio
I got to stop referring to it as a garage. The conversion is almost done. We are waiting on the windows and doors but the hand over of this phase should be at the end of next week. Then we have a three week wait for the wood frame (couldn't be avoided) and boom, the… Continue reading The Studio
Plaster and plastic
There is meant to be a storm coming in tomorrow. It is going to be a big one and we have weather warnings. Currently we have the two dormers stripped and the garage plastered but not 100% watertight as the doors and windows aren't in. Scaffolding on the outside of the house... In fact, this… Continue reading Plaster and plastic
The build is coming along
The garage, I must stop calling it that... The studio is now boarded out and has the electric wiring for the plugs and piping for the radiator. It is all looking pretty good. The door will eventually open into the kitchen. Plastering in there starts tomorrow and then we are going to start sorting out… Continue reading The build is coming along
Walls
We are just getting the first walls appearing on site. Covid, I was hoping it wouldn't impact us too much, looks like it will be making the build a little difficult as there is a wait on the wooden framing. But it isn't too long and there is plenty to do around the site so… Continue reading Walls
Mud is gone, hello concrete
So, the build has been progressing, but an awful lot has looked the same except for a bit of piping. But the real infrastructure has been going in. Now we have our floor level and all the drainage in. It is all pretty amazing. Next week the walls start to go in. I can't wait!… Continue reading Mud is gone, hello concrete
Optical illusions and designing
Well - we have the block foundations in and the insulation has just arrived. Things are moving as fast as ever and we are realising how big the extension is. It is a strange thing, to go from a plan to a physical thing. We are a mess but the foundations are going in. So,… Continue reading Optical illusions and designing